Connect with us

BAJEL

Bajel Projects Limited Formalises Landmark 500 KV Transmission Line Agreement with EETC in Cairo

Bajel Projects Limited (BAJEL) secures a ₹400 crore agreement with EETC for a 500 kV transmission line in Cairo, Egypt, marking a significant expansion in th.

seema chauhan author

Published

on

Bajel Projects Limited BAJEL 500 Kv Transmission Line Agreement

Bajel Projects Limited (BAJEL) has formalised a landmark agreement with the Egyptian Electricity Transmission Company (EETC) for the construction of two sections of a 500 kV overhead transmission line (OHTL) in Cairo, Egypt. This agreement, valued at over ₹400 crore, marks a significant expansion for BAJEL in the MENA region.

Strategic Partnership

The signing ceremony, held in Cairo, was attended by senior dignitaries from Egypt and India, including H.E. Mr. Suresh K. Reddy, Ambassador of India to Egypt, reflecting the strategic and diplomatic significance of the partnership. The ceremony was graced by Eng. Mona Rezk, Chairman of EETC, and Eng. Ahmed Fathy, Head of Central Projects Sector, EETC.

Significance of the Agreement

The combined order falls under the ultra-mega category and forms part of a flagship national grid reinforcement programme aimed at strengthening Egypt’s high-voltage transmission backbone. Speaking on the occasion, Mr. Rajesh Ganesh, Managing Director & CEO of BAJEL, said, ‘Winning these orders is a defining moment for BAJEL Projects. Being entrusted with a 500 kV transmission corridor in the MENA region reflects the global confidence in our engineering capability, project execution rigour, and ability to deliver complex high-voltage infrastructure in international markets.’ This agreement further consolidates BAJEL Projects’ position as a trusted international EPC partner in the high-voltage transmission segment.

As a result, BAJEL’s footprint in the MENA region is strengthened, complementing its strong domestic order book and recent international wins. The presence of H.E. Mr. Suresh K. Reddy at the signing ceremony underscores the strong and deepening economic ties between India and Egypt, highlighting the growing role Indian engineering and infrastructure companies are playing in the region’s power sector transformation.

Source: NSE Corporate Announcement

Fundamental & Technical Analysis of Bajel Projects Limited

Bajel Projects Limited belongs to the › sector. Here’s a quick read on where the business and the stock stand today.

BAJEL
Utilities › Utilities - Regulated Electric
CONSOLIDATING DOWN
70
Fundamental
44
Technical
58
Overall

1W +6.67%
1M -0.83%
3M -5.52%
P/E: 88.3 Cap: Small
AI-Powered Analysis • TradeAlone
Download the App for in-depth analysis of this stock

Bajel moves sideways over three months, with neither buyers nor sellers taking control. Razor-thin margins below 5% make profitability extremely vulnerable — this business needs scale or pricing power urgently. 1 loss quarter(s) over five years signals earnings fragility — not chronic but worth noting. The stock holds at 33% of its 52-week range with RSI at 35. In other words, neither side has a clear edge right now. Revenue grows at 67.5% and the stock moves sideways over three months. Neither side makes a strong case. The next earnings print will likely break this stock out of its current range. Check Fundamentals of Bajel Projects Limited.

BAJEL

Bajel Projects Limited (bajel) Wins ₹270 Cr Bid for Lakadia Inter-state Transmission Project

Bajel Projects Limited (BAJEL) secures ₹270 cr bid for Lakadia Inter-State Transmission Project, marking a significant win for the company’s power infrastruc.

priyanka verma tradealone

Published

on

Bajel Projects Limited BAJEL Wins Lakadia Transmission Project

Bajel Projects Limited (BAJEL) has emerged as the successful bidder for the Lakadia Inter-State Transmission Project under the TBCB route, marking a significant milestone for the company’s power infrastructure division. AnantGrid Projects One Private Limited (AGPOPL), a joint venture of Bajel Projects Limited (26%) and National Investment and Infrastructure Fund (74%), received a Letter of Intent (LoI) from PFC Consulting Limited (PFCCL) declaring it the winner of the bid.

Project Details

The project involves the construction of approximately 270 km of 765 KV double-circuit transmission lines from Halvad to Vadodara in Gujarat, along with additional works at three substations: Halvad, Vadodara, and South Olpad. The transmission scheme includes the evacuation of power from Lakadia (Phase-II: 7.5GW), Jam Khambhaliya (Phase-II: 5.5GW), and Jamnagar (Phase-I: 1GW) – Part-A.

Significance of the Collaboration

This win underscores the successful collaboration between Bajel Projects Limited, National Investment and Infrastructure Fund (NIIF), and AnantGrid Private Limited. Established in March 2026, this partnership aims to deliver high-quality transmission infrastructure to support India’s renewable energy targets. The collaboration leverages NIIF’s investment and asset management capabilities, AnantGrid’s project development expertise, and Bajel’s engineering, procurement, and construction strengths.

As a leading company in power infrastructure, Bajel Projects Limited is committed to driving operations excellence and making significant contributions to India’s renewable energy capacity goals by 2030.

Source: NSE Corporate Announcement

Fundamental & Technical Analysis of Bajel Projects Limited

Bajel Projects Limited belongs to the › sector. Here’s a quick read on where the business and the stock stand today.

BAJEL
Utilities › Utilities - Regulated Electric
CONSOLIDATING DOWN
70
Fundamental
44
Technical
58
Overall

1W +6.67%
1M -0.83%
3M -5.52%
P/E: 88.3 Cap: Small
AI-Powered Analysis • TradeAlone
Download the App for in-depth analysis of this stock

Bajel moves sideways over three months, with neither buyers nor sellers taking control. Razor-thin margins below 5% make profitability extremely vulnerable — this business needs scale or pricing power urgently. 1 loss quarter(s) over five years signals earnings fragility — not chronic but worth noting. The stock holds at 58% of its 52-week range with RSI at 53. In other words, neither side has a clear edge right now. The stock rises 6.6% in three months on 67.5% revenue growth. As a result, the market gives it more credit than the fundamentals strictly justify. Watch the next quarterly results. If growth accelerates, the move makes sense. If not, expect some gains to unwind. Check Fundamentals of Bajel Projects Limited.

Continue Reading

BAJEL

Bajel Projects Limited (bajel) Wins INR 600+ Crore Ultra-mega Order for 765kv Transmission Line

Bajel Projects Limited (BAJEL) secures a significant ultra-mega order worth INR 600+ crore for a 765kV transmission line project.

Pranab Tyagi at TradeAlone

Published

on

Bajel Projects Limited BAJEL Ultra-mega Order August 2026

Bajel Projects Limited (BAJEL) has been awarded an ultra-mega order worth INR 600+ crore for a 765kV transmission line package (TL05) under the WR-ER Inter-Regional Network Expansion Scheme – Part A. This significant win reinforces Bajel’s position as a preferred EPC partner for strategic grid-strengthening projects across India.

Project Scope and Impact

The project involves constructing 765kV double-circuit transmission lines connecting Raigarh (Tamnar), Raigarh (Kotra), and Dharamjaygarh in Chhattisgarh. This initiative aims to reinforce critical inter-regional power evacuation capacity between the Western and Eastern regions of the national grid.

Company’s Growth and Vision

Commenting on the development, Mr. Rajesh Ganesh, MD & CEO of Bajel Projects Limited, said: ‘This order strengthens our presence in high-capacity 765kV transmission infrastructure and reflects the continued trust placed in Bajel’s execution capabilities. As India’s power grid scales up to meet rising demand, we remain focused on delivering projects that are critical to the nation’s energy security and inter-regional connectivity.’ This win adds to Bajel’s growing order book in high-voltage transmission infrastructure.

As a leading company in power infrastructure, Bajel Projects Limited is known for its project management skills and excellence in driving operations. Being part of the Bajaj Group, Bajel continues to be a preferred partner for several states, national, and international utilities and private infrastructure players.

Source: NSE Corporate Announcement

Fundamental & Technical Analysis of Bajel Projects Limited

Bajel Projects Limited belongs to the › sector. Here’s a quick read on where the business and the stock stand today.

BAJEL
Utilities › Utilities - Regulated Electric
CONSOLIDATING DOWN
70
Fundamental
44
Technical
58
Overall

1W +6.67%
1M -0.83%
3M -5.52%
P/E: 88.3 Cap: Small
AI-Powered Analysis • TradeAlone
Download the App for in-depth analysis of this stock

Bajel moves sideways over three months, with neither buyers nor sellers taking control. Razor-thin margins below 5% make profitability extremely vulnerable — this business needs scale or pricing power urgently. 1 loss quarter(s) over five years signals earnings fragility — not chronic but worth noting. The stock holds at 52% of its 52-week range with RSI at 60. In other words, neither side has a clear edge right now. The stock rises 5.8% in three months on 67.5% revenue growth. As a result, the market gives it more credit than the fundamentals strictly justify. Watch the next quarterly results. If growth accelerates, the move makes sense. If not, expect some gains to unwind. Check Fundamentals of Bajel Projects Limited.

Continue Reading

BAJEL

Bajel Projects Limited Secures Mega and Ultra-mega Orders Worth INR 700 Cr+ for WR-ER Inter-regional Network Expansion Scheme

Bajel Projects Limited (BAJEL) secures INR 700 Cr+ orders for WR-ER Inter-Regional Network Expansion Scheme, marking significant wins in power transmission.

Manas shah, Analyst — IT & Software

Published

on

Bajel Projects Limited BAJEL Mega Ultra-mega Orders August 2026

Bajel Projects Limited (BAJEL) has been awarded two significant EPC orders for transmission line packages TL06 and TL02 under the WR-ER Inter-Regional Network Expansion Scheme – Part A. The combined value of these orders is over INR 700 crore. TL06 qualifies as a Mega order and TL02 as an Ultra-Mega order, according to the company’s project classification policy.

TL06 – LILO of Ranchi (New) – New PPSP 400kV D/C Line at Jamshedpur (New)

TL06 involves the design, supply, erection, testing, and commissioning of new 400kV double-circuit transmission lines connecting Jamshedpur (New) with Ranchi (New) and New PPSP. This project aims to reinforce inter-regional power evacuation capacity between the Western and Eastern Regions.

TL02 – Raigarh (Tamnar) – Jamshedpur (New) 765kV D/C Line, Part-II

TL02 entails the construction of a new 765kV double-circuit transmission line from Raigarh (Tamnar) to Jamshedpur (New), Part-II. This project further strengthens grid connectivity across Chhattisgarh and Jharkhand, supporting the broader WR-ER corridor.

Rajesh Ganesh, Managing Director & CEO of Bajel Projects Limited, commented: “Bagging two orders – TL06 and TL02 – under the WR-ER Inter-Regional Network Expansion Scheme in quick succession is a strong endorsement of Bajel’s execution capabilities across both 400kV and 765kV transmission systems. These packages are critical to strengthening power flow between the Western and Eastern regions, and together they mark one of our largest transmission line wins to date. Our teams are fully geared up to deliver both projects safely, and to the highest standards of quality.”

For more information, visit bajelprojects.com. For further information, please contact corporate.communications@bajelprojects.com or investor.relations@bajelprojects.com.

Source: NSE Corporate Announcement

Fundamental & Technical Analysis of Bajel Projects Limited

Bajel Projects Limited belongs to the › sector. Here’s a quick read on where the business and the stock stand today.

BAJEL
Utilities › Utilities - Regulated Electric
CONSOLIDATING DOWN
70
Fundamental
44
Technical
58
Overall

1W +6.67%
1M -0.83%
3M -5.52%
P/E: 88.3 Cap: Small
AI-Powered Analysis • TradeAlone
Download the App for in-depth analysis of this stock

Bajel moves sideways over three months, with neither buyers nor sellers taking control. Razor-thin margins below 5% make profitability extremely vulnerable — this business needs scale or pricing power urgently. 1 loss quarter(s) over five years signals earnings fragility — not chronic but worth noting. The stock holds at 52% of its 52-week range with RSI at 60. In other words, neither side has a clear edge right now. The stock rises 5.8% in three months on 67.5% revenue growth. As a result, the market gives it more credit than the fundamentals strictly justify. Watch the next quarterly results. If growth accelerates, the move makes sense. If not, expect some gains to unwind. Check Fundamentals of Bajel Projects Limited.

Continue Reading

Trending

Exit mobile version